Skip to content

Road Construction Delay: Extended Travel Time from Munich to Berlin on ICE Route

Due to a shut route in Franconia, travelers using ICE services between Munich and Berlin will encounter extended travel durations.

Delay in Construction Works Causes Longer Travel Time from Munich to Berlin, According to ICE
Delay in Construction Works Causes Longer Travel Time from Munich to Berlin, According to ICE

Road Construction Delay: Extended Travel Time from Munich to Berlin on ICE Route

The upcoming Bavarian summer holidays are set to see disruptions on the ICE route, with construction work causing significant travel time increases. The railway has announced that the work cannot be carried out during regular operation, leading to changes in travel plans for many.

During the closure period, passengers on the ICE route between Munich and Berlin can expect extended travel times of approximately 100 minutes. This is due to the closure of the track between Bamberg and Forchheim, which is part of the construction work on the ICE route. The closure is necessary for commissioning the new tracks and connecting them to the existing line.

Passengers of regional trains and S-Bahn will have to switch to replacement buses during the closure. Unfortunately, the ICE stops in Coburg, Bamberg, and Erlangen will not be in service during the construction period.

The closure on the ICE route between August 25th and September 9th is due to the four-track expansion of the route between Nuremberg and Bamberg. This closure will affect the ICE route between Munich and Berlin, causing extended travel times.

While specific alternate routing details for this exact closure window are not yet available, related diversions on long-distance lines involving northern and southern Germany suggest patterns and common alternatives. Typical ICE trains might be rerouted through the Erfurt - Leipzig - Berlin corridor or possibly via Nuremberg southbound to other lines, depending on operational feasibility.

There are disruptions in southern Germany’s long-distance traffic due to storm damage affecting Munich-Stuttgart connections and others, which may impact route options. No long-distance trains currently run between Stuttgart and Munich because of these disruptions, potentially reducing some southern detours.

For long-distance north-south travel, ICE trains often use alternate routes passing through cities like Leipzig or Würzburg and adjust stops accordingly to bypass closures. Passengers should expect extended journey times due to detours and possible slower speed on alternate tracks.

Rail authorities typically publish exact diversion details closer to the date, including platform changes and alternative connections, but no precise official rerouting for Bamberg-Forchheim closure is present in the current sources. Travelers are advised to check closer to travel date for official diversion announcements and timetable updates.

In summary, the alternate routes for ICE trains from Munich to Berlin during this period will mainly bypass the closed Bamberg-Forchheim stretch by diverting via Erfurt, Leipzig, or Nuremberg corridors where operationally possible, with expected longer travel times and adaptations due to other regional disruptions. We recommend that travelers stay updated on the latest information to ensure a smooth journey during this period.

  1. Due to the closure on the ICE route between August 25th and September 9th, passengers traveling by ICE trains between Munich and Berlin may need to consider alternatives in the finance sector to manage extended travel times resulting from the disruption.
  2. The upcoming public-transit disruptions on the ICE route could significantly impact transportation options within the industry, necessitating adjustments in travel plans for many, especially during the summer holidays.

Read also:

    Latest