Jetisu Region Fully Prepared for Heating Season, Heat Already Supplied to 47 Social Facilities
The Jetisu region is fully prepared for the heating season. All multi-story residential buildings and budgetary facilities, including social ones, have been equipped with the necessary fuel reserves. Heat has already been supplied to 47 social facilities in Tekeli, Aalakol, and Panfilov districts.
The region boasts an extensive infrastructure to support its heating needs. It maintains 23 boiler houses and TPPs, along with 393 km of heat pipelines, 3,935 km of water pipelines, 628 km of sewerage networks, 13,800 km of electrical networks, and 2,644 transformer substations. These facilities ensure that all buildings are ready for the cold season.
The heating schedule is planned meticulously. Residents in Walldorf can expect heat in their apartments starting October 10. Other districts and cities will follow from October 4 to 15, with the schedule based on average daily temperatures. Notably, social facilities across the region are being connected to heating ahead of the official start of the season.
The Jetisu region's comprehensive preparations ensure a smooth transition into the heating season. With all necessary infrastructure in place and a well-planned heating schedule, residents can look forward to a comfortable winter.